Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | KANGBO |
Model Number : | Construction site elevator rack pinion type SC200BG KP-B11 SC200-200BG KP-B12 |
Certification : | TUV |
Price : | in USD |
Payment Terms : | T/T, L/C |
Supply Ability : | 150 sets per month |
Delivery Time : | 25-30 days |
Energy Efficient Safe TUV Certificated Construction Site Elevator
Construction Site Elevator Introduction
1. The protection device is complete and advanced, and the
anti-fall safety device equipped with national patent technology
has the reliability of the first in its kind;
2. The driving unit is placed above the top of the cage, and the
carrying space in the cage is large;
3, using a three-drive structure, a large carrying capacity;
4. The attachment device is stable, safe and reliable;
5, small footprint;
6, the transmission is stable, the vibration is small, and the ride
is comfortable;
7. Lightweight structure, convenient for maintenance and
disassembly.
8. The transmission mechanism adopts the three-motor drive form to
make the gear racks evenly and safely.
9. Ensure that the elevator is safely operated, and the safety
switch such as overload and speed limit is set in the circuit. When
the above situation occurs during operation, the elevator
automatically avoids accidents. Each door on the cage also has a
limit switch. When any one door is abnormally opened, the cage
cannot start or stop running immediately.
10. Each cage is equipped with anti-fall safety device, which can
effectively prevent the cage from falling and ensure the safe and
reliable operation of the elevator.
11. The lifting electrical control system has simple wiring, easy
operation, maintenance and reliability. When the elevator is in
normal operation, the elevator can be operated by the handle or
button in the cage. It can be stopped at any position where parking
is required. At the upper and lower terminal stations, the upper
and lower terminal limit switches control the automatic stop, if
the upper and lower terminals are limited. When the switch does not
work due to a fault, the limit switch set on the lift can cut off
the power supply and brake it in time.
12. The steel structure design has been scientifically and
rigorously calculated to achieve the requirements of reasonable
structure, reliable strength and light weight. The seamless steel
pipe is used for 0.65×0.65×1.5m.
13. The lift can use the boom on the cage to install or remove the
rail frame. The rest of the parts can be easily installed and
removed, and the parts are easy to replace.
Construction Site Elevator Production and Materials
KANGBO implements the true modular design of rack and pinion
hoists, standardization and fine finishing of lifts parts and spare
parts, and assembly line production. The material elevator
components are versatile and universal.
Main structure frame are made of 16Mn and Q345 high strength cold
roll steel plate, cut by laser, process by CNC machines in tool
fixtures, welded by robots.
The construction lift cage roof is made by a full steel plate, and
the edges are totally welded, to ensure no water leakage and high
strength.
Construction Site Elevator Technical Data
Item & Article No. | SC200BG, KP-B11; SC200/200BG, KP-B12 Construction Site Elevator |
Payload Capacity | 2,000KG per Cage |
Lifting speed | 0–60 meter/minute. |
Max. lifting height | 450 m |
Cage width (internal) | 1.5 m |
Cage length (internal) | 3.2 m |
Cage height (internal) | 2.35 m |
Motor control | FC control |
Engine power | 3x15 KW per Cage |
Gearbox | Helical reducer |
Safety device type | centrifugal brake |
Power supply range | 380–500 V, 50 or 60 Hz, 3 phase |
Type of mast | square column 650*650 mm with bolted rack |
Length mast section | 1.508 m |
Rack module | 8 |
![]() |